Tuesday, December 12, 2017

Construction: Weeks 9, 10, 11 and 12

I have been struggling to write this blog post. It has been postponed from week to week.

I have been busy, doing a lot of manual labour out at the site and a lot of desk work the rest of the time. And these weeks have felt challenging; I have been frequently overwhelmed.

Rather than not writing a blog post about these weeks at all, I am resorting to a classic cheat borrowed from William Goldman's A Princess Bride:

What with one thing and another, four weeks passed:

I had some trouble finding someone willing to dig my well and install my septic system, but fortunately, my plumber was able to recommend someone excellent. We walked the land and he recommended the place for the well, very close to the massive felled maple log that was dropped when my power lines were installed last year. It was going to need to be cut up and moved. So, I boldly set about cutting it into shorter logs with my small chainsaw. At one point, I pinched my saw and had to free it with a hand saw. One of the joys of being a rookie... 

A rare view of the low side of the cabin.


In Week 9, the cabin was wired
Roxul insulation getting stockpiled

Week 10: Excavator, on the job!
The septic tank
The septic field
The septic system covered with fill, seeded with clover and covered with hay.
Guess what got dug up? Rocks! Now placed aesthetically along my driveway
Meanwhile, in the house, the interior walls were being insulated. 

And I drove to Ross Farm museum to pick up the barn door hardware they had made for me.

Here's the hatch for my firewood pass-through.

The excavator, resting after its labours.
I take a time-out to appreciate the beauty of a wee, still-red oak
Over the weekend between Weeks 10 and 11, the house sees its first light dusting of snow
Week 11: The well gets dug.

 They went down about 14 feet and there was so much water that the excavation crew could hardly level the first crock before the water was threatening to come in over their boots. Here is the well after the concrete apron has been poured. (The next day the water rose up over the apron!) I feel like I have won the rural home lottery! 




My awesome plumber comes and installs the well-line and pump
Bright blue well line for the water and rainbow electrical wire for the pump – pretty! 

Next, the trench was dug for the well-line. We hit a snag here, but I don't want to talk about it. Suffice it to say, we got through it. 

Guess what else got dug up? More rocks! Including some really, really big ones.

Meanwhile, I was working on augmenting the insulation around the slab, having fun with an exacto knife and a pickaxe.

And inside, the insulation and vapour barrier were complete and the drywall was delivered and stored ready for the following week.

Week 12 began with the site in a great big mess.

(Trenches can be beautiful, though).

With the trench for the well line dug and filled back in, next was the trench to bring power from my shed to the house. 
The electrical cable and the conduit containing my internet cable had to be seated in sand and inspected before the trench could be filled back in.

Where the electrical service enters the cabin.

In the cabin, the drywall was going up.

Outside, I was unearthing some pretty big rocks in the process of regrading the land around the house to lay insulation out two feet from the slab at an angle of 4 degrees (or more). Some of the rocks were too heavy for me to move. Fortunately, my stellar carpentry crew helped me roll the biggest ones out of the way.

Here's one corner of the insulation around the outside of the slab.

On the last day of the excavation work, my well and septic contractor brought me a load of Class A as a bonus – I will use it to backfill against my house, over the slab insulation. 
While putting together the photo essay portion of this post, I think I have found a few words to say. 

These four weeks felt intense. I was on-site a lot. On the one hand, it was lots of fun to be at the heart of the action. I really like all of the people working on the project, so it was great to hang out and indulge in a little banter.

At the same time, though, I was working hard: digging, digging and more digging. It was good for me, but at the same time exhausting and hard on my joints. (I've started going to see a chiropractor again after a 7-year break and it is rescuing me from immobilization).

While it was physically grueling, it didn't require any particular skills. It was a part of the job that I could do, and I needed to invest all the sweat equity that I could because somewhere in these four weeks, I ran out of money. Which is to say that I ran out of my money, money that I had or had access to on my own responsibility.

This project has been more expensive than I hoped. That is always said of building projects and that's because it's probably always true. There is so much to do, especially so much infrastructure to establish for a rural house.

Fortunately, I have friends and family to help me out and they have encouraged me to keep going. Many have provided moral support and encouragement, some have loaned tools and equipment, others have given their time to help, some have loaned and some have given me money to help make it possible for me to complete this project. I feel very, very lucky and very, very grateful.

And at the same time, I'm pretty stressed. I didn't want to take on this much debt. I foresee some austerity measures and as much desk work as I can get my hands on for the next 3-5 years.

I do feel, though, that it is worth it. I have such a longing for a home of my own. It is starting to feel very real; I am getting to the point where I can visualize living in my home: reading, doing jigsaw puzzles, having dinner parties and summer visitors. Having a place to be myself, to be content, to be free and safe and peaceful.

And what a place it is. The Crooked Wood continues to provide me with a blessed sense of belonging. Each time I arrive there and breathe that first breath of forest air, I feel something sacred fill me: mind, body, heart and soul.

The thought of being able to live in my own home, cozily, year round, is worth the debts and the stresses and the challenges of this process.

It's simply where I feel I'm meant to be.

Monday, October 23, 2017

Construction: Weeks 4 and 5

BIG Weeks!

Weeks 4 and 5 were two major weeks. I was too overwhelmed and busy during and between them to write a blog post, so am putting both weeks together in one post now (at the beginning of Week 6). 

Somewhere in the middle of it all, Salinger and I reluctantly moved house, back into our winter digs in Lunenburg. While we are incredibly lucky to have these friendly and comfortable accommodations available to us for the third winter in a row, it was still a bad wrench to leave The Crooked Woods. But my little tiny house was getting chilly and starting to have problems with moisture and condensation and it was time to head for central heating.

Week 4

Week 4 was SLAB WEEK! This was one of the most nerve-wracking stages of the build so far. Pouring concrete is something you want to get right the first time. Second chances at a pour are virtually impossible. Also, if the cement truck can't access the site, there's a big financial penalty and then more work to do to make the site accessible. 

Fortunately, the cement truck was able to get back to the form on its first attempt, thanks to my amazing friend who widened out the driveway and cut a low limb off the big maple during Week 1.
Distributing the cement to the rear section of the form is heavy work, done by wheelbarrow. The work speeds up once the concrete can be poured directly from the truck's chute into the form.
All poured, partly trowelled
Power-trowelling!
The finished slab. I love the marbled look it has. 
The slab needed to be kept wet for three days to discourage cracks from forming. My rain barrel, a bunch of bed sheets and a big tarp helped with this task. Salinger putting his fluffy backside on the wet sheets was probably counter-productive, but very, very cute.
The ever-deepening chill was a big factor in deciding that it was time to move out to my friend's house in Lunenburg. Here is the radiant heater running full blast in the tiny house while I tried to get some desk work done in the early morning on one of my last days living on site...
The sub-contractors who worked on the slab were fantastic to have on site, continuing my lucky streak of skilled and friendly people working on this project.

Week 5

With the slab poured and set and inspected, the framing could begin. There was a risk of rain on Monday, so the work began on Tuesday, and holy cats, did it ever go quickly with four people on the crew and four days of gorgeous fall weather!!! 

Day 1 of framing
Detail, Day 2
End of day 2!
I was stuck in Lunenburg doing desk work on Day 1, but managed to get to the site to spend the morning on Day 2 and then stopped in for quick visits on Day 3 and again on Day 4. 

I was delighted on Day 2 to watch how the four-person crew functions as a well-oiled machine. Everyone had their tasks to meet the inter-locking requirements of the build. Boards needed to be selected and cut and placed and secured and I found it a graceful, intricate dance to watch. And I love the energy with which the crew works – music on the radio, banter back and forth, questions and answers – it all seems to flow with ease and enthusiasm. 

The best contribution I could make was to stay out of the way! So, I turned my hand to sorting out a bunch of paperwork to do with the build and making sure that all of the permits and plans would be readily accessible when I wasn't there. 

I had an unsettling feeling on Day 2. I walked around inside the framed space and was filled with a sense of panic – "It is TOO small!" I thought. "What have I done? What am I doing? I'm having something built that I'm going to HATE living in. Oh NO!!!!!"

Day 2, side view

But then, weirdly, when I came back at the end of Day 3 and two of the walls were sheathed with OSB, enclosing the building somewhat, it felt larger, rather than smaller. I felt perfectly comfortable, and thought "Oh, yes, this is exactly what I thought it would be like; this is plenty of room!"

And when I came back on Day 4, when all four walls were closed in to a height of 8 feet, the space felt even bigger and more comfortable. 

I can't decide if my brain just needed to adjust from my imagination to reality, from 2-dimensional plans to 3-dimensional space, or if there was some kind of cognitive block in my brain that meant I couldn't accurately gauge the volume of space when it was outlined without being enclosed. In either case, it was strange and unsettling, and I'm glad it passed. This project is way too major to have to live with discontent or disappointment about it!

Of course, I am curious to see how it feels once the walls are closed all the way in and the roof is on, as that will make a change yet again, I'm sure. 
Day 4
I got more chances to spend time on the building site over the weekend, because some friends invited me to stay in their nearby house while they were away camping.

Interior space taking shape – I love that high window. The small opening lower down on the left is for my firewood pass-through. 
Light and shadow at my back doorway.
The view from my back door. 
I had a moment, sitting in the back doorway when I could feel what it's going to be like to live in my house, with a deck or even a little screened-in porch to the south, and maybe even a deck on the east side, as well. I foresee a lot of coziness and peace and quiet, safety and comfort, protected and blessed by these trees.

I have been yearning for a home of my own for a long time. I feel very lucky and humbled and I am deeply, deeply grateful to all of the people and circumstances that are making this possible.