Construction: Weeks 18-22 (Including move-in!!!!)

Well, this is a much-delayed post.

My cabin got finished (YAAAAY!) and I moved in (YAAAAAAY!) in mid-February (YAAAAAAAY!)

I moved in the midst of an extremely large and demanding work project, which meant that my first several weeks in my home felt like camping. There was no time to get things organized and properly placed (tasks that are not my forte at the best of times and therefore would have consumed a lot of resources that I did not have available) and there was certainly no time for blog posts. But I have hot and cold running water, electricity and Internet, a bar fridge, an induction hot plate, a mattress and my awesome desk and kneeling chair and so I was good to go.

The last weeks of construction and first few weeks of living in my home felt surprisingly fragile to me. The pieces left to do in the last stages were very small, but they felt more overwhelming than many of the bigger elements that had been tackled toward the beginning of the process. I don't know if it was because I was tired, or had less time free from desk work, or felt daunted by the enormity of the transition facing me, or because of my erratic hormones and mood swings (most likely a combination of all of those things), but I felt delicate and teary.

Fortunately, I was able to feel the feelings and do the work and make it into the cabin. I love it and feel very contented and peaceful there. Which is not to say that I don't get tired and cranky and stressed or anything like that, but I feel like I have the space I need to be myself and feel safe in that, and that is an awesome feeling.

Having the floors stained and polished was a gift from my Mom. The floors are one of my favourite things about my house – handsome and easy to clean.

The amazing contractor who stained and polished my floors added a lovely rectangle at each door at my request. I don't know why, but for some reason, these boxes remind me of the department stores I went to as a child: Eaton's and Simpson's. I don't know why that should feel like a good and comforting thing, but it does.

And these beautiful stripes in my bathroom/mechanical room. 

One of my tasks was to sand and stain the material for the wood trim. I should have done it as soon as the trim material arrived, but I didn't and ended up having to rush it at the last minute before the carpentry crew came back in to install it.  

Painting the bathroom door

Forsythia: a gift of spring from a dear friend.

Getting so close! The trim and kitchen cabinetry got installed and only the electrical and plumbing finishing remained.


The bathroom door got hung with awesome hardware made by the blacksmiths at Ross Farm Museum. 
The back of the bathroom door – distressed.
The toilet and shower got installed. The tiling and the bathroom sink are going to have to wait until more money, time and energy are available. The water runs. Some of it is hot. This is more than good enough. (And yes, I do have a shower curtain now, I just don't have a photo of it on hand.) 



Everything including the kitchen sink! Complete with running water.

And the shelving unit on the reverse of the kitchen counter/shelves which serves my office space. Complete with an electrical outlet that was pretty awkward to install. My electricians had to do some super problem solving. They were very gracious about it. 
Move-in day! While I did spend a few nights at my house during the transition, it wasn't really home until Salinger moved in on February 15th. Here he is, settling in for his first night. It didn't take him long at all to adjust; he also seems to love our little home.
I had plenty more help during this transition. Help painting, help moving, listening ears and leaning shoulders.

On the day of my occupancy permit inspection, one of my tender-hearted friends helped me move some furniture from my tiny house and shed into the new cabin. We talked and cried and jumped up and down together. I could have hugged the building inspector when she okayed everything – no, wait, I DID hug her (with her permission). There were no snags and I felt again my deep gratitude to all of the dedicated and professional contractors who built my home as if it were there own, with care, precision and kindness. And I was grateful for the more-or-less successful job I had done impersonating a general contractor – I had acquired and supplied all of the necessary paperwork, we had ticked all of the necessary boxes and done everything we were supposed to do.

The cabin is lovely to live in. It is warm. It is bright. It is airy. It is beautiful. It is simple. Everything works.

There are many finishing touches that need to be added. Now that my very hectic work schedule has slowed up, I need to move in properly. I need to move some pantry shelving and book shelves from my tiny home into the cabin. I need to figure out where things are going to go. I need to find the bag of hardware that will let me put my bed frame together. I need to apply linseed oil and varathane to my kitchen/office cabinets and a few coats of varathane on the window sills, too. I need to set up my turntable and move my records in. I need to make myself fully at home.

Salinger: showing his appreciation for the beautiful, wide windowsills (and not so much for the view of winter outside... )
Eventually, as time and money are available, I will have the shower tiled, the bathroom sink installed, and a deck built. This summer, I will try to do as much as I can to contribute to the healing process for all of the cuts and scars on the land that were caused by the construction.

In good time, I expect that the Crooked Wood, Salinger and I will all find our stride to integrate and grow together.

Friday, April 29, 2016

The Driveway Completed (A Tiny Home/Land Development Report)

What a week this has been! It's amazing how quickly things can happen sometimes!

My driveway entrance
I have felt this to be a rollercoaster week emotionally. I was elated on Monday – so excited about work beginning on the driveway sooner than I had hoped.

Around the gentle curve...

I was advised to install one culvert to manage water
through the "dip" in my driveway
I felt frustrated and aggravated on Tuesday and Wednesday, because my volume of desk work was very heavy and I had to stay in my home office, ploughing through work, when all I wanted to do was go out to my land and watch the bulldozer and dump truck do their thing.

But, I consoled myself with the thought that I need all the desk work I can get in order to pay for the work being done on my land. It's the age-old Catch-22 of time but no money, or money but no time. And since working for money is vital to this land-development process – while sitting out there watching wouldn't contribute anything – it was a no-brainer where I needed to be. Even if my inner-four-year-old did spend a little bit of time whining about wanting to go see the big machines in action.

A call out on Facebook for photos from neighbouring friends resulted in two different people sending me pictures of the work done on Monday night and Tuesday morning. Those photos, and the kindness of the people who sent them to me, soothed my soul.

My clearing, facing the sun and the
jeez-I-hope-I-don't-have-to-cut-down-that–maple.
My clearing, facing back out
toward the un-driveway
Yesterday, I was so excited, I actually forgot it was market day and missed the Lunenburg Farmer's Market for the very first time since I started living in Lunenburg for the winter.

Happily, I was able to get out to my land for about an hour, in time to watch (and enjoy) the process of digging the septic system test pit. I can't remember ever having been that excited about a hole in the ground.

The backhoe dug a deep hole (big rocks! very cool) and the engineer had a good look at my dirt. Sandy loam was the verdict – very auspicious soil for a septic system. The topography is also favourable for a less-expensive gravity-fed system. We discussed the best site for the house, too, and I believe I have settled on a location that means I won't have to cut down the beautiful old maple tree in the middle of my clearing. All in all, an excellent day.

The septic test pit
And, the driveway is now completely done! My contractor had predicted five days, but finished in four. All that's left to do is run a cheque up to his house today or Monday. 

A number of people have warned me that everything about this project will probably take longer than expected and cost more than I thought, but so far so good! Buying the land proceeded ahead of schedule, cutting trees went more quickly (and was less expensive) than I thought it would be and the driveway too is completed earlier than I thought and didn't cost as much as I feared (although it's not small change, I feel like I paid a fair price for the work done).

This feels like a big milestone to reach. I don't know why it should be so, but the land looks and feels more "open" now that there's a road instead of just a lumber-strewn cutting.

I am one year into this process. I hope it's going to be only three years in total before I am all set up. Because I like graphs and stuff, here is a proposed timeline:


My next two big tasks are to establish my garden and to move my tiny home from West Dublin to Crousetown. Stay tuned for all the news!

(Now back to work for me! I have never seen such a busy April! The VERSE is throwing whacks of work my way, which is very helpful and for which I am very grateful!)